PRE-MIX CONCRETE

Kwik Post

SUGGESTED USES

4” x 4” post in 8” tube or hole by 4’ deep = 2.5 bags

6” x 6” post in 12” tube or hole by 4’ deep = 4 bags

  1. Dig hole and position post. Allow a minimum 2” (5cm) gap around post.
    DO NOT MIX THIS PRODUCT.
    Allow only 5 minutes for next two steps.

  2. Saturate soil at the bottom of the hole with water. Add enough Kwik Post to come within 4” (10cm) of the top of the hole.

  3. Pour or spray water on surface of the Kwik Post until soaked. Poke with a rod or stick, 4 or 5 times, to allow surface water to penetrate the dry material.

For best results:

Kwik Post will start to stiffen in 5 minutes, and the post will be load bearing within several hours. Warm water will speed up the set time and cold water will slow down the set time. Moisten the exposed surface of the concrete and slope away from the post to allow water to run-off to prevent post rotting.

Kwik Post contains Portland Cement. Direct contact may irritate eyes and skin. Wear protective clothing (gloves, boots and safety glasses) when using this product. Wash exposed areas promptly with water. If any material gets into the eyes, rinse thoroughly with clean water and seek medical attention immediately.

DO NOT TAKE INTERNALLY.

KEEP AWAY FROM CHILDREN AND PETS. 

Clean up is easy with soap and water.

Rinse tools before material hardens.

Learn more about Kwik Mix